Well, the little Boston Terriers kept running into the woods...so it was time to provide a luxury-looking fence on this property...keeping in the quality with the new home the owners had just built 'on the pond'.....we set up the stakes...and got our plans and material lists together.......
and began to set the posts and deliver the materials in stages.....
the vinyl posts were set in concrete... 24" into the ground....
and the assembly began...manuvering the 8' 'scallops' over a sloping land was not easy...and the 2" below the bottom rail didn't give us room to 'trim' the bottom of the pickets and keep total top alignment...
we set panels in place...and then re-set them again and again for the proper look...
all in all the project took over 1 1/2 weeks because of the trial/error of making it look the best we could with the slopes......and then we built Double Gates (for the ltractor and lawn mower to go thru..) and a single gate overlooking the pond.....